Hydropower progress: the chute
Friday, June 4th, 2010The next stage in the water wheel construction is nearing completion. Because the ‘engine’ of the system is a permanent magnet generator from a wind turbine, and a water wheel turns much more slowly than a wind turbine, the wheel needs to be linked to the PMG via a gearing system that steps up the number of revolutions. To work out the optimum gear ratio for this installation, we needed to measure the actual rpm the wheel produces at present water volumes. For that to be done, we needed to construct the chute to deliver the water to the wheel.

Present water volumes in the levada. Not huge. About 2 litres per second.

