Hydro power commissioning
Monday, November 8th, 2010No matter how much effort goes into the attempt to get it right first time, inevitably, and most especially with experimental technologies, there’s a teething problem or two …

With rainy days becoming more frequent now – so that finally, after a long dry summer, there’s more than 1 litre per second coming down the barroco – we’ve had the chance to finally commission our water wheel installation and see how much power it’s capable of generating.
